Power Plants |
|||
EGAT Thailand |
GE Enter Gatecycle Training |
||
Gulf Electric Samutprakarn Thailand
|
Implementation of GE Enter Efficiency Map Online Performance Monitoring & Optimization System |
||
Tuas Power Singapore |
Feasibility Study Thermal Energy Storage System |
||
Tuas Power Singapore |
Combined Cycle Blocks I & II Efficiency Monitoring |
||
Muara Karang Power Plant, Jakarta, Pembangkitan Jawa Bali (PJB) Indonesia |
2x200 MW Steam Plant and 500 MW 3+3+1 Combined Cycle Plant Maintenance Optimization Program: Plant Efficiency, Performance Monitoring & Maintenance Optimization |
||
Nanyang Technological University, Singapore
|
Mechanical Engineering Course Energy Conversion Module - Practical Application of Thermodynamic Simulation Software |
||
Gulf Electric NongKhae Thailand |
Implementation of GE Enter Efficiency Map Online Performance Monitoring & Optimization System |
||
Gresik Power Plant, Gresik Jawa Timur, Pembangkitan Jawa Bali (PJB) Indonesia
|
2x200 MW Steam Plant and 480 MW 3+3+1 Combined Cycle Plant Efficiency Program |
||
Paiton Power Plant, Jawa Timur, Pembangkitan Jawa Bali (PJB) Indonesia |
2x400 MW Coal Fired Steam Plant Efficiency Program |
||
PT MTS (Maintenance Total Solutions) Indonesia
|
Asset Optimization Program Seminar - Presentation on Plant Efficiency Performance Monitoring Program |
||
| Power Seraya Singapore | Steam Unit Energy Audit & Plant Efficiency Performance Monitoring Program | ||
|
Tuas Power Singapore
|
Combined Cycle Blocks III and IV. Efficiency Performance Monitoring to Input to Condition Based Predictive Maintenance Program | ||
Prai Power (Malakoff) Malaysia |
Training Module on Combine Cycle Plant Energy Balance Principles and Hydraulic Calculation Basics |
||
Tanjung Bin Power (Malakoff) Malaysia |
Training Module on Coal Fired Plant Basic Principles and Thermodynamic Modeling Aspects |
||
Lumut Power (Malakoff) Malaysia |
Training Module on Combined Cycle Power Plant Operation Principals - Basic |
||
Power Seraya Singapore |
CCP10/20 Performance monitoring program to drive operational and maintenance efficiency improvement measures |
||
Senoko Power Singapore |
Pilot study carried out on the efficiency versus load curve of repowered unit CCP3 | ||
Senoko Power Singapore |
Combined Cycle Performance monitoring appreciation training course | ||
Prai Power (Malakoff) Malaysia |
Technical Service Agreement to provide full suite of performance monitoring and training services to enable plant engineers to eventually carry out own monitoring tasks | ||
Teknik Janakuasa Sdn Bhd Malaysia |
Peformance Monitoring services on Thermodynamic - The O&M service provider to Teknik Power and Utitlities plants in Malaysia, South East Asia and Middle East | ||
MTBE Malaysia Sdn Bhd Malaysia |
Implementation of online system to measure energy performance and provide operational targets. Optimize Boiler loads and Choice of Turbine / Motor driven Utilities Pumps and Compressors | ||
Power Seraya Singapore |
Performance Monitoring Tools and Training for stage 1,2 & 3 Steams Units | ||
Senoko Power Singapore |
Performance Monitoring Study for the 3x Alstom combined cycle plants | ||
SembCorp Cogen Singapore |
Energy Audit | ||
Kuraray Asia Pacific Singapore |
Feasibility Study Cogen plant | ||
Senoko Energy Singapore |
Energy Audit of CCP5 before and after the major inspection in Jul-Sep 2010 | ||
Refinery and Petrochemicals |
|||
ThaiOil Sriracha Thailand |
Feasibility Study Utilities Optimization System |
||
Pertamina Cilacap Refinery Indonesia |
Energy Efficiency & Utilities Reliability Inventorisation |
||
PertaIndmina Balongan Refinery onesia |
Feasibility Study Utilities Optimization System |
||
Reliance Refinery Jamnagar India |
Feasibility Study Utilities Optimization System |
||
Keppel Engineering Pte Ltd, Singapore |
Project Involvement to Install Flue Gas Treatment Plant at Tuas Incineration Plant, Singapore |
||
Petronas Penapisan Trengganu Sdn Bhd, Kertih, Trengganu, Malaysia |
Energy Management System Review |
||
Petronas Penapisan Trengganu Sdn Bhd, Kertih, Trengganu, Malaysia |
Refinery Energy Management System |
||
Petronas Penapisan Trengganu Sdn Bhd, Kertih, Trengganu, Malaysia |
Feasibility Study and Basic Engineering Package for Debottlenecking of Crude Distillation Unit |
||
Petronas Penapisan Trengganu Sdn Bhd, Kertih, Trengganu, Malaysia |
Online Advisory Utilities Optimization System to Optimize Boiler Loads and Choice of Turbine or Motor Driven Utilities Pumps and Compressors |
||
Petronas Penapisan Trengganu Sdn Bhd, Kertih, Trengganu, Malaysia |
Oil Movements Performance Enhancement Study |
||
MTBE Malaysia Sdn Bhd, Gebeng, Malaysia |
Online Energy Management System to enable high level Energy Indices to be linked to operational parameters. An online Utilities Optimization system was also implemented to enable optimal choice of motor and turbine driven equipment for minimum cost Utilities operation | ||
EMSB |
Energy Management System Review | ||
ABF Sdn Bhd |
Implementation of online Energy Management System which will link high level management energy performance KPIs to energy operating parameters for operational guidance | ||
Petronas Penapisan Melaka Sdn Bhd, Melaka Malaysia |
Review of Crude Oil import and tankage facilities | ||
Propane Dehydrogenation Unit (Kuantan Malaysia) |
Implementation of online system to measure energy performance and provide operational targets | ||
Propane Dehydrogenation Unit (Kuantan Malaysia) |
Online Advisory Utilities Optimization System to Optimize Choice of Turbine / Motor driven Utilities Pumps and Compressors | ||
Petronas Penapisan Melaka Sdn Bhd, Melaka, Malaysia |
Cogen Performance Monitoring System and Online Advisory Utilities Optimization System to Optimize GT/HRSG and STGen Load and Choice of Turbine or Motor Driven Utilities Pumps and Compressors | ||
Asean Bintulu Fertilizer Sdn Bhd, Malaysia |
Provision of Service for Design, Supply, Delivery, Installation, Configuration, Testing and Commissioning of Plant Information Enhancement (PIE) system for ABFSB | ||
Petronas Penapisan Melaka Sdn Bhd, Malaysia |
Provision of Detailed Design, Configuration, Procurement Testing, Installation and Commissioning of Utilities and Cogen Optimization - Additional work for Modification Utiltiies Optimizer for PSR2 Revamp | ||
| Energy Cost Reduction | |||
Ministry of Environment Singapore |
NEEC Seminar Presentation Energy Management at the Workfloor |
||
Ministry of Environment Singapore |
Energy Audit Scheme Framework |
||
National Environmental Agency Singapore |
Presentation given on “Condition Monitoring for Predictive Maintenance to Maximize Plant Energy Efficiency” at the NEA organized Energy Efficiency Seminar for the Process Industries | ||
Vopak Terminals Singapore |
Energy and Utilties Assessment for Vopak Storage Terminals at Sebarok and Sakra | ||